Site 3A
Mining Site — Fully Managed
Onshore Gulf Texas
Available

EFFECTIVE POWER COST

5.94¢

per kWh

MINING CAPACITY

.5 MW

Megawats

Efficiency

13.5 J/TH

Joules per Terahash

BTC Per Month

.38

Bitcoin

Cost To Produce

$43725

per BTC

Availability

8-12 Weeks

Launch Ready

Site Specifications

Power Source

Flare/Stranded Gas

Cooling Type

Air

Generator

Used Cat XQ550G NG

Container

ANTBOX

ASIC Model

Bitmain S21XP

Total Hashrate

24 PH

Monthly OPEX

$14263

Operations

Fully Managed

Maverick Site

Turnkey Price

$ 975000
Location
South Texas
Availability
8 Weeks
NDA Required
Yes — protects site location & gas data
Operations
Fully Managed — Gas Mine

SITE-3 is a 500-kilowatt Bitcoin mining installation in the Texas Onshore Gulf region, designed for efficient operation at a compact scale. The site draws on stranded natural gas — gas that lacks viable pipeline access and would otherwise go unmonetized — routing it through a Used CAT XQ550G NG generator, a natural gas-optimized unit well-suited for field power generation in remote or underserved pipeline areas.

Mining hardware — 108 units of the Bitmain S21 XP — is deployed in a Used Antbox container, a field-proven air-cooled enclosure that delivers practical durability at reduced capital cost. Running at 13.5 joules per terahash, the S21 XP provides 29 petahash per second of aggregate hashrate from a total power draw of approximately 395 kW.

With an effective power cost of 5.94 cents per kilowatt-hour and a Bitcoin production cost of $43,725 per coin, SITE-3 operates at a modestly higher energy cost than the larger portfolio sites — a natural reflection of its smaller scale and gas-specific generation equipment. Nonetheless, it represents a viable gas monetization strategy particularly suited to well operators with smaller gas volumes seeking to generate meaningful Bitcoin yield from an otherwise stranded asset. The site produces approximately 0.39 BTC per month.