18 MW Wyoming Bitcoin Mining Infrastructure — Sites SP03 & SP08
Wyoming · Active & available immediately · Air-cooled
A turnkey, grid-independent Bitcoin mining platform across two active Wyoming sites — fully built, powered, and operational. With a secured utility agreement delivering all-in power at $0.043- $0.075 /kWh, 18 MW of installed capacity, and 5,750 air-cooled miner slots, this is production-ready infrastructure available for immediate acquisition. Bring your own miners and start hashing.
| Total power | 18 MW |
| Miner slots | 5,750 (air-cooled) |
| Active sites | 2 |
| All-in power cost | $0.043/kWh (at ~75% uptime, curtailment-adjusted) |
| Cooling | Air-cooled (Nektar containers) |
| Status | Active — available immediately |
| Asking price | $350,000 per MW — $6,300,000 total (18 MW) |
The Two Sites
SP03
- Location:, Wyoming
- Power capacity: 8 MW
SP08
- Location:, Wyoming
- Power capacity: 10 MW
Power Infrastructure
Purpose-built for reliable, low-cost operation with an independent feed at each site.
- All-in power cost: $0.043- $0.071 /kWh under a secured, active utility agreement (both sites)
- Voltage supply: 24.9 kV (MV) stepped down to 415 V (LV)
- Transformers: Bretco pad-mounted, 4000 / 3000 kVA
- Switchgear: QT Corp MV/LV distribution
- Site structure: Independent feed per site — grid-independent, high-reliability design
- Average uptime: ~75%-95% (curtailment-adjusted)
- Billing: Hash output vs. contracted load
Fully Equipped — Included in Sale
Mining containers —
MV transformers (Bretco) —
Switchgear & distribution (QT Corp)
Networking —
Security & access —
Software platforms
Operational handover — full SOPs and O&M manuals, vendor and supplier relationships, and established reporting cadence and task logs.
Not Included
ASIC miners / hashing hardware · client-owned hosted mining equipment · working capital and accounts receivable.
Blue Hawk Energy Solutions — Monetizing energy. Powering the future. BLUEHAWKBTC.COM