GT7
Raw PPA / GPA
Salt Lake City
Under Contract

EFFECTIVE POWER COST

4.5¢

per kWh

MINING CAPACITY

1.4 MW

Megawats

Efficiency

Joules per Terahash

BTC Per Month

Bitcoin

Cost To Produce

per BTC

Availability

November 1st

Launch Ready

Site Specifications

Power Source

Cooling Type

Generator

Container

TBD

ASIC Model

Total Hashrate

Monthly OPEX

Operations

Fully Managed

Maverick Site

Turnkey Price

Location
South Texas
Availability
8 Weeks
NDA Required
Yes — protects site location & gas data
Operations
Fully Managed — Gas Mine

GT7 is one of the most distinctive operations in the Blue Hawk portfolio — a 1.1 to 1.4-megawatt Bitcoin mining facility in Utah powered not by natural gas, but by geothermal energy. This renewable, continuously available heat source provides electricity at a competitive and stable rate, insulated from the price volatility and regulatory exposure associated with fossil fuel generation. As one of a rare class of geothermally-powered mining operations in the United States, GT7 represents Blue Hawk’s commitment to exploring diverse, low-cost, and environmentally responsible power sources for Bitcoin production.

As an example you could install your own Mining hardware consisting of 265 units of the Bitmain S21+ Hydro, deployed within a Foghashing S1200 hydro-cooled container — the same premium hydro system used across Blue Hawk’s highest-performance sites.

At an effective power cost of 4.06 cents per kilowatt-hour and a possible Bitcoin production cost of $29,494 per coin — among the lowest in the portfolio — GT7 demonstrates that geothermal power can compete directly with stranded gas economics when the resource is well-matched to the mining load. The site produces approximately 0.96 – 1.12 BTC per month, generating steady, low-carbon Bitcoin with a cost structure positioned favorably across a wide range of market conditions.