Site A2 AiR
Mining Site — Fully Managed
Inshore Gulf Texas
Available

EFFECTIVE POWER COST

4.42¢

per kWh

MINING CAPACITY

1 MW

Megawats

Efficiency

13.5 J/TH

Joules per Terahash

BTC Per Month

1.079

Bitcoin

Cost To Produce

$32316

per BTC

Availability

8-12 Weeks

Launch Ready

Site Specifications

Power Source

Flare/Stranded Gas

Cooling Type

Air

Generator

Used CAT G3516

Container

Custom 2 MW New Air Cooled Container

ASIC Model

Bitmain S21XP

Total Hashrate

81 PH

Monthly OPEX

$31244

Operations

Fully Managed

Maverick Site

Turnkey Price

$ 2200000
Location
South Texas
Availability
8 Weeks
NDA Required
Yes — protects site location & gas data
Operations
Fully Managed — Gas Mine

Site A2 AIR is a 1-megawatt air-cooled Bitcoin mining installation in the Texas Onshore Gulf corridor, powered by associated natural gas generated as a byproduct of ongoing oil production in the region. Rather than allowing this valuable energy resource to be vented or flared, the site’s Used CAT G3516 generator captures and converts it into cost-effective electrical power for continuous mining operations.

The site deploys 300 units of the Bitmain S21 XP in a NEW FBOX air-cooled container — an advanced enclosure designed to optimize airflow and cooling efficiency for high-density ASIC deployments. Operating at 13.5 joules per terahash, the S21 XP is one of the highest-performing air-cooled miners available today, giving Site A2 AIR a total hashrate of 81 petahash per second at a total wattage draw of approximately 1,096 kW.

At 4.42 cents per kilowatt-hour effective power cost and a Bitcoin production cost of $32,316 per coin, Site A2 AIR pairs competitive mining economics with a streamlined capital structure. Generating approximately 1.08 BTC per month, this site is well-suited for operators seeking capable, maintainable mining infrastructure in one of Texas’s most active upstream energy regions.